Monday, February 27, 2017

List of confirmed sabotage-diversionary actions of the Union of Armed Combat (ZWZ) and Home Army (AK) from 1 January 1941 to 30 June 1944



Reference 1: Cumulative number of actions.

Reference 2: Damaged locomotives, Delayed repairs to locomotives, Derailed transports, Transports set on fire, Damage to railway wagons, Blown up railway bridges, Disruptions to electricity supplies in the Warsaw grid, Army vehicles damaged or destroyed, Damaged aeroplanes, Fuel tanks destroyed, Fuel destroyed (in tonnes), Blocked oil wells, Wagons of wood wool destroyed, Military stores burned down, Disruptions of production in factories, Built-in faults in parts for aircraft engines, Built-in faults into cannon muzzles, Built-in faults into artillery missiles, Built-in faults into air traffic radio stations, Built-in faults into condensers, Built-in faults into (electro-industrial) lathes, Damage to important factory machinery, Various acts of sabotage performed and Pre-planned assassinations of Nazi Germans.

Source: http://en.wikipedia.org/wiki/Polish_resistance_movement_in_World_War_II


No comments:

Post a Comment